CN1688
Press Center
- -

Fujian Yuanxiang New Materials Co., Ltd. has an annual output of 40,000 tons of high-performance silica and the first public announcement of the environmental impact assessment of the industrial upgra

2016-02-25
1093

Public participation is an important part of the environmental impact assessment of construction projects. In order to maximize the benefits and avoid disadvantages of the project construction, and to achieve good economic and social benefits while protecting the surrounding environment, we will focus on the environment that is of common concern to the general public around the site. problems (such as air pollution, water pollution, noise impact, etc.), solicit various suggestions for project construction, so that in the environmental impact assessment and environmental protection design of the project, on the premise of economical rationality and technical feasibility, the necessary measures can be taken in a targeted manner. measures to eliminate or mitigate adverse environmental impacts. We hereby announce the basic situation of the project and the main contents of the environmental impact assessment to the society, and hope to actively express personal opinions and make suggestions and suggestions for the construction of this project.


1. Name and overview of the construction project

Project name: annual output of 40,000 tons of high-performance silica and industrial upgrading technical transformation project

Location: within the original site of Shaowu Suburban Economic Development Zone.

This "annual output of 40,000 tons of high-performance silica industry upgrading technical transformation project" is planned to be carried out in the original factory area of Fujian Yuanxiang New Materials Co., Ltd. The production process adopts the high dispersion precipitation method for production. The existing 1 set of 50,000 t/a white carbon black production unit has been transformed into special equipment for pilot test; the existing 1 set of 15,000 t/a white carbon black production unit has been optimized and upgraded, and the scale can reach 20,000 t/a; build a new 20,000 t/a high-performance silica production unit. The restructured production scale is 2 production lines, with a total annual output of 40,000 tons of high-performance silica. The project utilizes the original public and auxiliary facilities.


2. Name and contact information of the construction unit of the construction project

Construction unit: Fujian Yuanxiang New Materials Co., Ltd.

Address: Shaowu Suburban Economic Development Zone, the original factory Zip code: 354000

Tel: 0599-6301908 Fax: 0599-6301889

Contact: Nie Zhiming


3. The name and contact information of the environmental impact assessment agency undertaking the assessment;

EIA agency: Henan Yuantong Environmental Protection Engineering Co., Ltd.

Address: 14th Floor, People's Property Insurance Company Building, No. 6 Daliang Road, Kaifeng City, Henan Province

Postcode: 475000

Tel: 0371-22619699

Contact: Mao Yan


4. Main work content and work procedures of environmental impact assessment;

According to the characteristics of this phase of the project, the current situation of the site area and planning functions, the main work content is planned to be set up as follows for evaluation:

-- Engineering Analysis

——Technical and economic demonstration of pollution prevention and control measures

—— Industrial policy, feasibility demonstration of site selection environment

—— Regional pollution source investigation and environmental status assessment

—— Environmental impact analysis during construction period

—— Prediction and evaluation of environmental impact during operation period


-- Risk Assessment

—— Total amount control, cleaner production and circular economy

—— Environmental and economic profit and loss analysis


-- public participation

—— Environmental management and monitoring plan


- Evaluation conclusion


5. The main matters for soliciting public opinions;


    1. Do you think the impact of this project on your work?

    2. Do you think the impact of this project on your life?

    3. Do you think the impact of this project on your health?

    4. Do you think the impact of the project construction on the local environment?

    5. In your opinion, the impact of this project on the local society and economy?

    6. What are the environmental issues you are most concerned about during the construction and operation of this project?

    7. What is your attitude towards project construction?

    8. What issues do you think should be paid attention to in the selection of environmental protection measures for this project?

    9. Do you have any comments or suggestions on the construction of this project?


6. The main ways for the public to express their opinions

The time for the public to put forward their opinions is from September 24, 2015 (the date of the public announcement) to October 15, 2015, and the effective working day is 10 days, which is in line with the "Interim Measures for Public Participation in Environmental Impact Assessment" and no less than 10 working days. requirements. Units and individuals who wish to express their opinions should feedback their opinions to the construction unit or evaluation unit before October 15, 2015.

The public may express opinions in an eclectic manner, such as telephone calls, faxes, e-mails, or even to the construction unit or evaluation unit to express their opinions.


Fujian Yuanxiang New Materials Co., Ltd.

Henan Yuantong Environmental Protection Engineering Co., Ltd.

September 24, 2015